Tungkol sa karl reison rivera:
Karl holds a Bachelor of Science in Electrical Engineering and a Vocational Certificate in Industrial Instrumentation. He has 14 years of local work experience specializing in Construction Safety and is a DOLE Accredited OSH Practitioner. He passed the Lead Auditor Course of ISO 45001:2018, a CQI-IRCA accredited with Identification no 255975, as well as the Radiation Safety Officer examination under the Philippine National Research Institute and the International Safety Certification for Registered Safety Officer examination under the IBOESH United States.
I've worked on a variety of infrastructure projects. The Manila International Airport Land Reclamation, Angat Water Aqueduct Tunnelling, Novaliches to Balara Tunnelling, Leyte Geothermal Power Plant, NGCP Transmission Line Tower, and Manila International Airport Project are just a few of the notable projects I've worked on as a Safety Practitioner.
Karanasan
1. Surbana Jurong -Senior Safety Supervisor
Date of Employment: May 17,2021 – Present
- HSE Supervisor (Coastal Engineering/ Infrastructure Division) – Client Representative in the Project Development of Manila International Airport (MIA)
Date: May 17,2021 - Present
- Dredging and Sand Supply
- Land platform (land development and ground improvement work)
- Shoreline coastal protection (rock works) including coastal and river revetments
- River dredging areas
- Marine facilities
2. HASKELL PHILIPPINES (Engineering Design and Construction)- Senior Safety Coordinator
Date of Employment: November 11, 2019 – May 24, 2020
- Safety Lead – Site Preparation and Construction of Norwegian Cruise Line Project
Date: November 11, 2019 – May 24, 2020
- Pre-construction Site Preparation
3. FIRST BALFOUR INC.(Engineering Design and Construction) - Senior ESH Supervisor
Date of Employment: November 25, 2010 – October 15, 2019
Project handled during employment in First Balfour:
Date: August 2019 – Oct.15, 2019 ( ESH Lead - Erection and Construction for the HERMOSA – SAN JOSE 500kV Overhead Transmission Line Project)
- Foundation Works and Erection of Transmission Tower Line
- ESH Lead - Leyte Geothermal Business Unit (LGBU) Project – Geothermal Project ( Various Hook up and Landslide Mitigation Projects)
Date: November, 2018 – July 2019 (ESH Lead in Leyte Geothermal Power Plant Project)
- Mechanical Works / Hook Up Project (300 meters 16 diameter pipeline)
- Pipe Bridges
- Landslide Mitigating Measure
Date: May 1, 2018 – November 2018 - (ESH Lead in NBAQ4 TUNELLING PROJECT (6.5 km Tunneling Project)
- Mass Excavation Works for Outlet Structure and Road Preparation for Intake Structure
Date: March 2017 – May 2018 (ESH Lead - ANGAT WATER TRANSMISSION IMPROVEMENT PROJECT (6.5 km Tunneling Project)
- Site Preparation for Tunnel Boring Machine Access including Railway
- Construction of Tunnel Boring Machine Launching Chamber
- Construction of Transition Basin & Conveyance Channel, Overpass Bridge, Reinforced Concrete Box Culvert
- Construction of 865 Linear Meter 2-Lane Road Row to Inlet Area
- Slope Protection of surface areas through rock bolt and soil nailing
Date: Jan. 2, 2014- Feb. 2017( ESH Lead - FPIP II AND III VARIOUS PROJECT)
- Site Preparation of FPIP-II and FPIP III Expansion
- Construction of VEHICULAR Subway & PEDESTRIAN Underpass
- Road Construction including utilities
Date: June 2012– Nov.30, 2013 (ESH Officer in THERMA SOUTH 2x150MW COAL FIRED POWER PLANT PROJECT)
- Site Preparation of TSI-CFPP Project
- Bridge Construction
- Construction of Water Tanks
- Construction of 5km River Improvement, Riprap and Gabions.
- Pile Driving and Pile Load Testing of up to 700 Tons applied load.
Date: April 2011 – June 2012 (ESH Officer in NESTLE FRONTIER PROJECT)
- Site Preparation of 27 Hectares Project Site and Construction of Manufacturing Plant Building, Warehouse, Roads, Canals.
- ESH Officer – FPIC WEST TOWER RESTORATION PROJECT
Date: November 25, 2010 – April 17, 2011 (Construction and Rehabilitation of FPIC Oil and Gas Pipeline Facility.)
4. KEPPEL BATANGAS SHIPYARD (ESH Officer in Ship Building, Design and Construction)
Date of Employment: November 2008 – March 2010
- Ship Building and Ship Repair
- Ship Building and Ship Repair
- Construction of Foot of Rig
- Sand Blasting and Painting
- Actual Fire Fighting experience.
- Handles LPG, Reefer, Cargo, Tug Boats, Barge and Oil Tanker Ships
- Commissioning and Repair of Barge Power Plant.
Edukasyon
- Graduate of Bachelor of Science in Electrical Engineering
Mga propesyonal mula sa parehong sektor ng Konstruksiyon/Pasilidad tulad ng karl reison rivera
Mga propesyonal mula sa iba't ibang sektor malapit sa Batangas, Batangas
Iba pang mga gumagamit na tinatawag na karl
Trabaho malapit sa Batangas, Batangas
-
System Developer
Natagpuan sa: Talent PH A C2 - 5 araw ang nakalipas
Furukawa Automotive Systems LIMA Philippines, Inc. Lipa, Pilipinas PermanentRole DescriptionThis is a full-time on-site role for a System Developer at Furukawa Automotive Systems Lima Philippines Inc. The System Developer will be responsible for system development, software development, programming, databases, and testing. The role requires the candidate ...
-
Electrical Engineer
Natagpuan sa: Foundit PH A2 - 12 oras ang nakalipas
Dempsey Puerto Galera, PilipinasJob Title Electrical Engineer Reports to Maintenance Manager · Duties and · Responsibilities · ● Responsible for the maintenance, troubleshooting, and repair of electrical · systems, including power distribution, lighting, HVAC controls, elevators, fire · alarm systems, and other ...
-
Electrical Engineer
Natagpuan sa: Trabajos diarios PH C2 - 1 linggo ang nakalipas
DEMPSEY RESOURCE MANAGEMENT INC. Puerto Galera, PilipinasQualifications · ● Bachelor's degree in Electrical Engineering or a related field (Master's · preferred). · ● 1-5 years of experience in electrical engineering. · ● Proficiency in electrical design software (e.g., AutoCAD, Altium, etc.). · ● Strong knowledge of electrical codes a ...