Tungkol sa Ricardo Madridejos:

WELL EXPERIENCED PROJECT MANAGER.

Karanasan

 

 

 CAREER PROFILE

 

 

 

Strong Project Delivery; Technical; Commercial; Leadership and Relationship skills, underpinned by over 28 years of successful international experience in the Development, Design, Construction, and Operations of both greenfield and brownfield Petrochemical, Refinery, Oil & Gas facilities, LNG Plant, Offshore facilities, chemical, methanol plant, Natural Gas Processing Plant, Gas Oil Separation Platform, Wellhead Platform, Water Injection Platform, Oil Storage Tank Farm Facilities, subsea pipelines/ onshore pipelines and underground structures, Wastewater management Complex, Polyethylene and Ethylene plants, combined cycle power plant, FPSO conversion, risers umbilical, flow line, subsea pipelines and subsea structures, fire protection systems, HVAC and integrated electro-mechanical handling systems.

 

A proven track record where responsibilities have covered all aspects of Project Development and Delivery (SELECT, FEED, EPC, EPCM, PMC, Mega, and Multi-project portfolios) for both Client and Contractor organizations. 

 

Expert knowledge of FEED Engineering, Conceptual Studies, plant layout (piping and equipment) 3d modeling, pipe support design, and stress analysis review, piping and equipment fabrication, installation, mechanical completion, commissioning. Knowledge of relevant international standards and codes of practice normally used by Mechanical Engineering. ANSI, ASME, ASTM, BS, JIS, DIN, ARAMCO, PETRONAS, NACE, ExxonMobil, NORSOK, AUSTRALIA STANDARDS, CHEVRON, ASHRAE, SMACNA, TOTAL, ENI, AGIP KCO, BRITISH PETROLEUM, BRITISH GAS, PED STANDARDS, QATAR GAS, QATAR PETROLEUM, ADCO, API, and DEP SHELL.

 

Have a sound appreciation of oil and gas process design, preparation of piping specification, preparation of valves and specialty items specification and data sheet, preparation of specifications, data sheets, and design basis for mechanical equipment, pumps, pressure vessels, storage tanks, and rotating equipment. In-depth knowledge of Painting, Insulation, and Fireproofing for process and utility piping, flowlines, and Pipelines.

 

Design and selection of materials for different processes and environmental conditions. Expertise in the selection of materials for valves, piping and piping components, pressure vessels, HVAC packages, and mechanical equipment. 

 

Well-versed in process skid packages from design, detail engineering, fabrication, installation, mechanical completion pre-commissioning, commissioning, sea fastening, preservations, and start-up and third-party certifications. Participated in HAZID, HAZOP, Constructability Study, Model Review, etc.

 

Working knowledge on Risk Based Inspection of Plant, Piping, Rotating, and Static Equipment, and Process Plant Operation, Maintenance, and Inspection procedures.

 

Proven ability to manage EPC contractors, Fabrication Contractors, Construction contractors, Vendors, Suppliers, commissioning contractors, and Third-party certification contractors in a multidisciplinary context.

                                                                                                   

Well-versed in the preparation of cost estimates and preparation of bid documents. Excellent know-how in Procurement processes, Vendor evaluation, Technical Bid Evaluation for mechanical equipment, process equipment, bulk materials, structural and civil works, and long lead items.

 

 

Excellent capability working in multinational and multicultural environments. Excellent written, verbal, and presentation skills, particularly the ability to communicate in a multidisciplinary context. Excellent analytical and problem-solving skills. Mentoring and coaching ability. A high degree of competency in Microsoft Office Suite of programs.

 

 

March 2022–April 2023            PROJECT MANAGER PETROCHEMICAL

                                                  DEUS REFINERY AND PETROCHEMICAL LIMITED         

                                                  AKWA IBOM NIGERIA

 

Responsibilities:

 

  • Development of project schedules and project risk registers, construction and Procurement strategies
  • Establish and lead the project execution team to deliver the company’s project.
  • Analyzing all risks and other factors to assist with site selection  
  • In charge of all onshore and offshore survey works:
  • Developing CAPEX and OPEX assumptions 
  • Lead the tendering process, and manage the design contractor.
  • Developing  specifications for development projects to provide the basis for Environmental Impact Assessment
  • Managing all contractors, subcontractors, and partners
  • Assist in the preparation of Construction Contribute to project budgeting and risk management
  • Contribute to the assembly of and quality assurance checks for contract documentation
  • selection, coordination, and management of External Design Consultants
  • Tracks and provides daily updates on all “fire boards” projects.
  • Ensures that projects followed approved work processes.
  • Maintains and reports relevant KPIs and metrics at regular intervals.
  • Tracks and monitors group resource loads and ensures appropriate resource allocations.

 

                                         

February 2020 –March 2022     LEAD PIPING ENGINEER

                                                   TAKNIA LIBYA ENGINEERING COMPANY           

                                                   TRIPOLI LIBYA                                       

 

Projects handled:

 

Harouge Oil Company Fiscal Metering System Project

Waha Oil Company Surface facility Capacity Study (All plant)

62KWP Solar Power Plant Tajuora

Sabratah Offshore Platform (Gas Compressor Installation)

Mellitah Oil and Gas Company, A&E project.

100MWP Solar PV Plant- Kufra

Akakus Oil Operations, Abandonment, and Decommissioning Project.

Mellitah Oil and Gas Fire Protection Systems.

Waha Oil Company, Replacement of Tank-01,17,08,14 and 16.

Waha Oil Company, Installation of Pour Point Depressant skid at Es Sider Terminal.

 

Sabratah Offshore Platform (Gas Compressor Installation)

Mellitah Oil and Gas Company, A&E project.

Akakus Oil Operations, Abandonment, and Decommissioning Project.

Mellitah Oil and Gas Fire Protection Systems.

 

 

March 2017 –June 2018    CORPORATE PROJECT and ENGINEERING MANAGER           

                                            GJ HOLDINGS, INC.

                                            MAKATI CITY, PHILIPPINES

 

Projects handled:

 

GJKIDS SLES PLANT EXPANSION

PDAFI WAREHOUSE EXTENSION SULPHONATION PLANT

BALAYAN BAY BATANGAS DEVELOPMENT INC. SURFACTANT CHEMICAL PLANT

OFFICE BUILDING CONSTRUCTION, 

PROCESS BUILDING CONSTRUCTION, 

ROAD AND DRAINAGE SYSTEM CONSTRUCTION,

HVAC SYSTEMS FOR ALL BUILDINGS 

SEWER SYSTEMS CONSTRUCTION

TANK AND TANK FARM CONSTRUCTION, 

ELECTRICAL SUBSTATION CONSTRUCTION, 

DIESEL GENERATOR INSTALLATION.

 

  • Assigned persons for each project.
  • Manage construction contractors and suppliers.
  • Responsible for overall planning and execution of Construction
  • Monitor and interact with clients, consultants, and subcontractors
  • Monitor and oversee daily scheduled work activities
  • Ensure timely completion of project schedules
  • Oversee the delivery and use of materials, tools, and equipment
  • Oversee the quality of construction, worker productivity, and safety
  • Approves change orders, variation orders, concession requests, and non-conformance requests.
  • Monitors schedule and evaluates the progress of construction activities.
  • Controls cost and budget allocation for the project.
  • Reviewed and approved the construction sequence/logic, method statement/procedures, and pre-task planning to ensure constructability and safety during the execution phase.
  • Supervise sewer construction.
  • Supervise/monitor sewer repair using the slip-lining method.
  • Supervise/monitor piping fabrication, hydro testing, installation, and commissioning.
  • Supervise/monitor painting, insulation, and fireproofing for piping, pipelines, pressure vessels, and storage tanks.
  • Monitor equipment installation progress and quality.
  • Monitor storage tank fabrication and installation progress and quality.
  • Monitor DCS, MCC, LCP, substation, power cable and electrical rack, instrument cable, rack, and instrument installation.
  • Monitor and approved the execution of site pre-commissioning activities such as flashing/blowing, hand cleaning, reinstatement, preservation, and loop check.
  • Monitor and approved the execution of site commissioning activities such as Function Test, Mechanical run, Catalyst/Chemical loading, Inerting, Chemical cleaning, Dry-out, Leak test, and drying.
  • In charge of turn-over planning, turn-over procedure, preparation of turn-over dossier, control and clearance of punch items, and issue of turn-over certificates.
  • Overall, in charge of civil, structural, mechanical, equipment, piping, electrical, instrumentation, and controls.

 

 

March 2015 –present     MANAGING DIRECTOR          

                                        RIMADRIDEJOS TRADING AND CONSTRUCTION

                                        MUNTINLUPA CITY, PHILIPPINES

                                        (Currently non-operational)

Projects handled:

 

PAPUA NEW GUINEA HYDROELECTRIC POWER PLANT

BID FOR BINGA HYDROELECTRIC POWER PLANT

CONSULTANT FOR HYDROELECTRIC POWER PLANT CONTRACTORS

 

 

  • Assigned persons for each project.
  • Prepared bid documents and costing.
  • Overall, in charge of civil, structural, mechanical, equipment, piping, electrical, instrumentation, and controls.
  • Conduct workshops for young engineers and mid-level engineers for mechanical plant design and layout.

 

March 2015 –May 2016    PROJECT MANAGEMENT CONSULTANT- MECH/PIPING             

                                           DMS PTE LTD-CHINA 

 

Projects handled:

 

FPSO CYRUS CONVERSION PROJECT FOR PETROIRAN

Flare System Package

Riser Balcony Package

Flare KOD Package

Steam Turbine Power Generation Package

Water Injection Package

Fresh Water Maker package

Chemical Injection Package

Steam Generation Package

CSU/ Test Separator/Slug Catcher/Elect Dehydrator/Elect Desalter /Wash Water System,

Diesel Flushing System Package

Fire Fighting Systems, Deluge, and Foam Systems

Fuel Gas System Package

Mechanical handling equipment, cranes, winches, and hoist packages.

Helicopter Refueling Skid Package

Marine Boiler Feed Water System Package

Marine Lube Oil System Package

Marine Fire Water System Package

Marine Foam Generation System Package

Instrument Air System 

Accommodation of HVAC, Plumbing, and Fire Protection Systems

 

  • Implementation of the strategy in terms of technology, schedule, and target cost, engineering, procurement, subcontracting, construction, and pre-commissioning / commissioning and start-up assistance.
  • Control of all factors, which affect the quality, the schedule, and the project cost.
  • Prepared the Piping material Specification and Piping Material Selection Philosophy for the project.
  • Issuing the monthly progress reports to Company regarding the current project status, 
  • Monitoring the project execution in the shortest possible time and at a reasonable cost while maintaining the quality required by the Contract. 
  • Issuing of the 90 days front-end project schedule.
  • Clear definition of the extent and the nature of the services, which are required by the Contract.
  • Coordination and supervision of all contacts with suppliers, subcontractors, inspection agencies, insurance companies, and local authorities.
  • Manage construction contractors and suppliers.
  • Approves change orders, variation orders, concession requests, and non-conformance requests.
  • Monitors schedule and evaluates the progress of construction activities.
  • Reviewed and approved the construction sequence/logic, method statement/procedures, and pre-task planning to ensure constructability and safety during the execution phase.
  • Controls cost and budget allocation for the whole project.
  • Monitor and approved the execution of site pre-commissioning activities such as flashing/blowing, hand cleaning, reinstatement, preservation, and loop check.
  • Monitor and approved the execution of site commissioning activities such as Function Test, Mechanical run, Catalyst/Chemical loading, Inerting, Chemical cleaning, Dry-out, Leak test, and drying.
  • In charge of turn-over planning, turn-over procedure, preparation of turn-over dossier, control and clearance of punch items, and issue of turn-over certificates.

 

December 2014-March 4 2015    Discipline Lead Piping

                                                      SHELL Projects

                                                      Chiyoda Almana LLC

                                                     Doha Qatar

 Projects handled:

 

Qatar Shell Gas to Liquid Plant (LNG)

Pearl Steam Boiler Project.

Flare Closed Drain Project.

Seal Gas Back Flow Preventer Project

LPG Reliability Upgrade.

Surplus Water Export Project.

Ethane Export Project.

Waste Water Treatment Plant

 

  • Assigned persons for each project.
  • Manage construction contractors.
  • Approves change orders, variation orders, concession requests, and non-conformance requests.
  • Monitors and evaluate the progress of construction activities.
  • Assumed focal point responsibility for the Piping Department.
  • Planning, coordination, executing, and controlling the Piping and Layout Engineering activities by Project requirements within the assigned budget, schedule, and quality standards.
  • Prepared the Piping material Specification and Piping Material Selection Philosophy for the project
  • Good attitude to collaborate within the Project team and with the Project interfaces, ensuring coordination of interfaces flow (in / out information), and keeping track of all.
  • Supervise painting, insulation, and fireproofing for piping, pipelines, pressure vessels, and storage tanks.
  • Reviewed and approved the construction sequence/logic, method statement/procedures, and pre-task planning to ensure constructability and safety during the execution phase.
  • Monitor and approved the execution of site pre-commissioning activities such as flashing/blowing, hand cleaning, reinstatement, preservation, and loop check.
  • Monitor and approved the execution of site commissioning activities such as Function Test, Mechanical run, Catalyst/Chemical loading, Inerting, Chemical cleaning, Dry-out, Leak test, and drying.
  • In charge of turn-over planning, turn-over procedure, preparation of turn-over dossier, control and clearance of punch items, and issue of turn-over certificates.
  • Identification of tools for adequate efficiency improvement.
  • Coordination with the Project staff supporting project management 

 

June 2012-October 2014    Head of Piping Department KL

                                            Global Process Systems

                                             Kuala Lumpur Malaysia

 

        Projects handled:

  1. CAIRN INDIA Ltd.

  RAVVA OIL & GAS DEVELOPMENT.

  1. SHELL PHILIPPINES EXPLORATION B.V.

  Fuel Gas Conditioning package

  1. Sarawak Shell Berhad-Fuel gas Systems Package
  2. CHEVRON BANGLADESH-Fuel Gas Package
  3. BUMI ARMADA-Produced Water Hydro cyclone &Induced Flotation Unit
  4. SANTOS Mereenie LPG Recovery Plant FEED. Waste Water treatment plant.
  5. MODEC TEN FPSO- LPGC COMPRESSOR PACKAGE 2PA, 2PB &2PC.
  6. BUMI ARMADA ANGOLA 15/06 EAST HUB FPSO-Sea Water Coarse and Fine Filter Package, Vacuum Deaerator Package, Sulphate Removal package Proposal.
  7. OBEN GAS PLANT IN NIGERIA
  8. OBEN GAS PLANT Waste Water Treatment Plant

 

  • Manage all the Engineering contractors for the project.
  • Manage multi-discipline and multicultural engineering personnel.
  • Serves as a key person for all engineering and construction activities.
  • Ensured that the Company’s Safety, Health, and Environmental standards conform to Best Industry Practices and that relevant legislative requirements are implemented.
  • Prepared the Piping material Specification and Piping Material Selection Philosophy for the project
  • Responsible for the mechanical handling study, DESIGN PHILOSOPHY, DESIGN BASIS, mechanical handling specifications, and installation and commissioning.
  • Responsible for the correctness of all plot plans, equipment layout, piping layout, and 3D PDMS model. Took ownership of the 3D model and make sure that all comments from all stakeholders are incorporated in the 30% model review,60% model review, and 90% model review,
  • Responsible for all the packaged equipment including all the static and rotating equipment for all projects. Scope starts from FEED, detail engineering, fabrication, commissioning, and handover to the customer.
  • Prepared CTRs and Equipment and Piping GA for all project proposals.
  • Manpower forecasting and planning.  Ensured that suitably qualified and experienced resources from the discipline are assigned to project or proposal work
  • Planning, coordination, executing, and controlling the Piping and Layout Engineering activities by Project requirements within the assigned budget, schedule, and quality standards.
  • Good attitude to collaborate within the Project team and with the Project interfaces, ensuring coordination of interfaces flow (in / out information), and keeping track of all.
  • Supervise painting, insulation, and fireproofing for piping, pipelines, pressure vessels, and storage tanks.
  • Achievement of assigned goals and fulfillment of the project quality requirements and obligations.
  • Definition of the list of activities, list of deliverables, schedule, and controls activities following Project requirements.
  • Monitor and approved the execution of site pre-commissioning activities such as flashing/blowing, hand cleaning, reinstatement, preservation, and loop check.
  • Monitor and approved the execution of site commissioning activities such as Function Test, Mechanical run, Catalyst/Chemical loading, Inerting, Chemical cleaning, Dry-out, Leak test, and drying.
  • In charge of turn-over planning, turn-over procedure, preparation of turn-over dossier, control and clearance of punch items, and issue of turn-over certificates.
  • Understands customer needs and ensure that they are being satisfied
  • Managed and resolved any customer issues that may arise (internal and external)
  • Financial Review of project engineering budgets in line with business interests
  • Prepared and agreed on the annual departmental budget and that expenditure is justified within the allocated budget
  • Ensured that project scope growth is correctly documented and that company procedures are implemented

 

February 2012-Dec 2012     Technical Authority- Piping Mechanical

                                               Internal Assurance Department

                                               AGIP Kazakhstan North Caspian Operating Company

                                               Kashagan Field Development-Experimental Project

                                               Atyrau, Kazakhstan (50 billion USD)

 

        Projects handled:

  1. Kashagan Phase I (EP)
  2. Raw Gas Injection Compressor, Nouvo Pignone
  3. Turbo Expander Compressor, MTC USA
  4. Solar Gas Turbine.
  5. Diesel Driven Firewater Pump Package, Frank Mohn AS.
  6. Fresh Water Skid Package, Ormandy Ltd.
  7. Fuel Gas Skid, SIIRTEC NIGI SPA.
  8. Duplex Vertical Pumps, Flowserve
  9. ONSHORE PIPELINE
  10. SUBSEA PIPELINE
  11. WASTEWATER TREATMENT PLANT 

 

  • Ensured definition, dissemination, and update of Piping Discipline, Pipelines, and Mechanical Philosophies and standards for design, construction, and optimization of the production facilities; promoting for each pertinent field, the standardization, coding, and dissemination of the best operative methods and the definition of the best practices and performance indicators on the piping discipline.
  • Defined the guidelines for International Standards as well as ROK local standards and regulations and ensure compliance for Piping Discipline, Pipelines, and Mechanical in client baseline Philosophies and Specifications.
  • Manage the Engineering contractor. Review all deliverables and make sure that they are correct and submitted on schedule.
  • Responsible for Management of Change issues like PCN, Waivers, Concession Requests, and NCR.
  • Provided Technical Authority role for Experimental program and provided technical guidance to deviations and nonconformities from Client Technical standards as proposed by Client projects Support Engineering Groups in Piping Discipline, Pipelines, and Mechanical.
  • Responsible for compliance with all project contractual documents and deliverables.
  • Make sure that the Asset Register is current and updated.
  • Work with the Plant Manager to ensure the project is operating safely, in regulatory compliance, reliably, and efficiently.
  • Administer the Operations and Maintenance Agreement to ensure the Operator maintains compliance and qualified staff.
  • Administer Power Production Agreement and/or secure off-take agreements to maximize the project economics.
  • Administer Asset Management Contracts to ensure that PE Management Services complies.
  • Prepared the Piping material Specification and Piping Material Selection Philosophy for the project
  • Provided technical support and guidance to the client project and discipline engineers during the revision process/ approval of key documents like; Basis of Design, design Criteria, General Philosophies Plot plans, PFD, and be involved in HAZID, HAZOP, QRA,3D Model review as well as commissioning processes.
  • Provided technical support and guidance to EP Engineering Team to finalize the IVB Review process.
  • Supervise painting, insulation, and fireproofing for piping, pipelines, pressure vessels, and storage tanks.
  • Coordinated and managed all mechanical handling issues of all projects from the preparation of specification, philosophy, mechanical handling study, procurement support, layout preparation, etc.
  • Took “ownership” and develop company standards and signature solutions and ensure deployment on new projects and variations.
  • Answerable to all audits and reviews from the following SUVC/PSUR/PSUA/NCOC and NCPOC.
  • Reviewed project personnel, designs, and proceedings to ensure compliance with company culture, methodology, procedures, standards, and signature solutions.
  • Provided technical advice to project personnel.
  • Provided discipline engineering support to operations.
  •  

October 2010 to January 2012   PROJECT MANAGEMENT CONSULTANT

                                                     TECHNICS ENG’G AUSTRALIA PTY LTD

                                                     PERTH, WESTERN AUSTRALIA, AUSTRALIA

 

        Projects handled:

  1. ASSET MANAGEMENT AND RISK-BASED INSPECTION of Queensland Gas

Company Windibri and Kenya Processing Plant. (Brisbane, Queensland, Australia)

 

                           2. Consultant Mechanical Engineer for APA Group (Brisbane, Queensland, Australia).

 

 

       August 2008 to July 2010   PROJECT MANAGEMENT CONSULTANT

                                                   PREMIER OIL VIETNAM OFFSHORE B.V

                                                    (SANTOS, PREMIER OIL AND PETROVIETNAM JV)

                                                    HO CHI MINH CITY, Socialist Republic of VIETNAM

 

        Projects handled:

                                1.  120M USD Chim Sao Wellhead Platform

                                   

                                 2. 350M USD LEWEK EMAS FPSO

 

  • Ensured that the technical integrity of the Block 12W Development is secured across all Contractors; Focus on realizing project-specific fit-for-purpose concept, the basis for design, and specification with a clear view of the balance between cost and integrity. To maintain a strong and cooperative relationship with the various engineers in the relevant contractors in fulfilling the above.
  • Manage the engineering contractor.
  • Manage the construction contractor.
  • Manage all the vendors and suppliers.
  • Have been instrumental in the preparation of documents during the 2nd and 3rd stages of front-end engineering design (FEED) covering mechanical, piping, HVAC systems, painting and selection of material for Project Scope of work/contract, Basis of Design, Basic Engineering Design Data, Schedule, Coordination Procedure and Management of Change.

 

  • Supervised and monitor the jacket fabrication, load out, and transport offshore.
  • Supervised and monitor the topside platform fabrication, topside equipment installation, and commissioning.
  • Supervise and monitor the installation of risers, umbilicals, and subsea pipelines from FPSO to the wellhead platform and underwater tie-ins.
  • Supervise painting, insulation, and fireproofing for piping, pipelines, pressure vessels, and storage tanks.
  • Directed technical input for Mechanical. Piping, HVAC, and Coatings for WHP and FPSO.
  • Closed out EPC contract on detail design.

     

         June 2007 to August 2008      PROJECT MANAGEMENT CONSULTANT

                                                         TRUONG SON JOINT OPERATING COMPANY

                                                          (Talisman, PETRONAS, and Petro Vietnam Joint 

                                                          Venture Company) 

                                                          HO CHI MINH CITY, Socialist Republic of 

                                                          VIETNAM 

                                                        

          Projects handled:

                                1.  USD 65 M-Song Doc-A Wellhead Platform

                                  SRKP Phase 1 Development 

                                 2. USD 170M-SONG DOC PRIDE-MV19 FPSO

 

  • Manage the engineering contractor.
  • Manage the construction contractor.
  • Manage the vendor and supplier.
  • Worked out Equipment Package Specifications for Gas Lift compressors, pedestal cranes, transfer oil pumps, chemical injection package, test separators, closed drain vessels, closed drain pumps, mechanical handling equipment( cranes, winches, and hoist), skimmer tanks and pumps, chemical tanks, mechanical handling systems, and firefighting and safety equipment for WHP
  • Reviewed and approved Piping Material Specification, Project Specification for Piping Valves, and Project Specification for Piping Design; Project Specification for Piping Insulation, Project Guidelines for Basis of Pipe Stress Requirements, Project Specification for Protective Coatings, and Project Specification for HVACs Systems for WHP.
  • Managed all interfaces with, WHP and FPSO EPC contractors, Equipment Vendors, and Discipline Engineering to make sure that no work is missed out and all scope of work is being taken care of.
  • Reviewed and approved Mechanical deliverables such as specifications, data sheets, RFQ, and TBE for Production facilities, (Produced Water Treatment, Gas Treatment, and Compression, Fuel gas Treatment, Water Injection, Sewage Treatment, Produced Water Injection, Flare System Chemical Injection, Closed and Open Drain Systems for the FPSO.
  • Reviewed and approved Mechanical deliverables such as specifications, data sheets, RFQ, and TBE for Power Generation Facilities, (Main Generators, And Emergency Generators. Main Boilers and Heaters, Feed Water and Condensate Systems) for the FPSO
  • Approved Mechanical deliverables such as specifications, data sheets, RFQ, and TBE for FPSO HULL facilities, (Pump Room, Cargo and Slop Tanks, Ballast Tank, Fuel Oil Treatment and Service Systems, Seawater service Systems, Hydraulic power, and control systems, Compressed Air Systems, Nitrogen Systems, Lube Oil Systems HVAC Systems, Mechanical Handling, and cranes, Winches and Lifting Appliances for the FPSO.
  • Responsible for the mechanical handling study, DESIGN PHILOSOPHY, DESIGN BASIS, and mechanical handling specifications and installation and commissioning. 
  • Prepared the Piping material Specification and Piping Material Selection Philosophy for the project.
  • Responsible for the correctness of all plot plans, equipment layout, ut, piping layout, and 3D PDMS model. Took ownership of the 3D model and make sure that all comments from all stakeholders are incorporated in the 30% model review,60% model review, and 90% model review,
  • Responsible for all the packaged equipment including all the static and rotating equipment for all projects. Scope starts from FEED, detail engineering, fabrication, commissioning, and handover to the customer
  • Reviewed and approved the construction sequence/logic, method statement/procedures, and pre-task planning to ensure constructability and safety during the execution phase.
  • Supervised and monitor the jacket fabrication, load out, and transport offshore.
  • Supervised and monitor the topside platform fabrication, topside equipment installation, and commissioning.
  • Supervise painting, insulation, and fireproofing for piping, pipelines, pressure vessels, and storage tanks.
  • Supervise and monitor the installation of risers, umbilical and subsea pipelines from FPSO to wellhead platform, and underwater tie-ins.
  • Supervised and Witnessed Factory Acceptance tests on selected equipment and skid packages for the WHP and FPSO.
  • Monitored Mechanical Completion, Pre-commissioning, Onshore Commissioning, and Offshore Commissioning up to the Start-Up of the Complete FPSO Song Doc Pride MV-19.
  • Responsible for the handover of facilities to operations.
  • Closed out EPC contract on detail design for WHP and FPSO.


  October 2006 to June 2007         SENIOR MECHANICAL ENGINEER

                                                          PROSAFE PRODUCTION SERVICES PTE, LTD

                                                          SINGAPORE

 

        Projects handled:

                                                POLVO FPSO, PETROBRAS BRAZIL

                                     Cidade de Sao Mateus FPSO, PETROBRAS BRAZIL 

 

  • Prepared a Fit for Service assessment of existing pressure vessels and tanks for POLVO FPSO to comply with Brazilian regulations.
  • Manage the engineering contractor.
  • Manage the construction contractor.
  • Manage the vendor and supplier
  • Participated in the risk assessment and hazard and operability studies of designs. Participated in Hazop studies.
  • Prepared the Piping material Specification and Piping Material Selection Philosophy for the project
  • Responsible for the mechanical handling study, DESIGN PHILOSOPHY, DESIGN BASIS, and mechanical handling specifications and installation and commissioning.
  • Responsible for the correctness of all plot plans, equipment layout, piping layout, and 3D PDMS model. Took ownership of the 3D model and make sure that all comments from all stakeholders are incorporated in the 30% model review,60% model review, and 90% model review,
  • Reviewed and approved the construction sequence/logic, method statement/procedures, material handling and warehouse storage, and pre-task planning to ensure constructability and safety during the execution phase.

 

  • Responsible for all the packaged equipment including all the static and rotating equipment for all projects. Scope starts from FEED, detail engineering, fabrication, commissioning, and handover to the customer.
  • Supervise painting, insulation, and fireproofing for piping, pipelines, pressure vessels, and storage tanks.
  • Witnessed and approved FAT, SAT, etc. for all equipment.
  • Monitored Mechanical Completion, Pre-commissioning, Onshore Commissioning, and Offshore Commissioning up to the Start-Up of the Complete FPSO.
  • Responsible for the handover of facilities to operations.
  • Closed out the EPC contract on the detailed design of the FPSO

September 2005 to August 2006      LEAD DISCIPLINE MECHANICAL ENGINEER

                                                          SARAWAK SHELL BERHAD

                                                           MIRI, SARAWAK MALAYSIA

 

        Projects handled:

E11 OFFSHORE PLATFORM REJUVENATION PROJECT

F23 OFFSHORE PLATFORM REJUVENATION PROJECT

F6   OFFSHORE PLATFORM REJUVENATION PROJECT

Glycol Regeneration Skid Package Engineer

LP Gas Compressor Skid Package Engineer

Skimmer Pumps Package Engineer

Firewater Pumps Package Engineer

Emergency Diesel Generator Package Engineer

Riser PIPELINE Package Engineer

Manual, Motor & Actuated Valves Package

Engineer

 

 

  • In charge of Facilities Development and Rejuvenation for Mechanical and Piping.
  • Manage the engineering contractor.
  • Manage the construction contractor.
  • Manage the vendor and supplier
  • Managed all interfaces with EPC contractors, Equipment Vendors, and Discipline Engineering to make sure that no work is missed out and all scope of work is being taken care of.
  • Reviewed and approved all Technical Requisition Packages (MR) for all mechanical equipment like glycol regeneration packages, LP Gas compressors, Skimmer pumps, Condensers, Exchangers, Pressure vessels, Turbines and Pumps, and piping bulks and accessories, and mechanical handling systems such as pedestal cranes, hoist trolley, pad eyes, beam clamps, etc.
  • Reviewed and approved all specifications and data sheets for all mechanical equipment like glycol regeneration package, GENSET, manual trolley hoist, skimmer pumps, condensers, exchangers, pressure vessels, turbines and pumps, pedestal cranes, firewater pumps nitrogen skid, CI skid, volume air tanks.
  • Verify and raise recommendations to the department Manager for endorsement of operational aspects of all the offshore facilities and subsea pipelines.
  • Review of the annual WP&B related to surface facilities activities to ensure that all the offshore facilities and subsea pipelines are operated with optimum cost without compromising safety and operability.
  • Actively monitor and oversight international operation of all offshore facilities and subsea pipelines to ensure compliance with Safety and Production objectives.
  • Organize regular coordination with every operator to discuss areas of concern and assist in their resolution.
  • Monitor Brownfield refurbishment projects and assess existing facilities’ impact on the field development plans.
  • Review the annual Work, Program, and Budget submitted by the operators.
  • Develop and manage guidelines/framework for managing non-operated assets and implement it across all assets.
  • Monitor the integrity of all assets.
  • Participate in forums to exchange information among the operators /projects on lessons learned from existing operations.
  • Commissioning of all mechanical and piping works.

 

  • Reviewed all existing Brownfield (Domestic) LTSAs due to termination and develop a new document in conjunction with the SSB Maintenance Teams.
  • Reviewed all Greenfield critical equipment and develop a new LTSA in conjunction with SSB Field maintenance teams, Operations and Interface teams, Project Teams, and projects contracts & Procurements.
  • Accountable for managing and engineering mulch-discipline projects from Front-End, Detail Design, Construction, Commissioning, Hand-Over, and Close-Out within schedule and cost.

 

 

       October 2004 to August 2005         LEAD CONSULTANT                                                     

                                                                RANHILL Engineers and 

                                                                Constructors SDN BHD.

                                                                KUALA LUMPUR, MALAYSIA 

                                           

  •  Reviewed the ITB (Invitation to Bid) documents submitted in the proposals stage, issued inquiry requisitions, reviewed techno-commercial vendor offers, and prepare equipment, material, and man-hour estimates. 
  • Have been involved in the preparation of documents during the 2nd and 3rd stages of front-end engineering design (FEED) covering mechanical, piping, HVAC, painting, and selection of material for Project Scope of work/contract, Basis of Design, Basic Engineering Design Data, Schedule, Coordination Procedure and Management of Change.
  •  Reviewed contract requirements for project execution, organize the preparation of the Technical Document Register (TDR), identify requirements and scope of work; reviewed specifications Process Data Sheets (PDS), Piping Material Specifications (PMS), Piping & Instrumentation Diagrams (P&ID’s), Plot plans, General Arrangement (GA) drawings, Review Philosophies, Area Classification Drawings, Fire and Gas Detector Layout Drawings, and other relevant documents. Establish contract review criteria, and identify and resolve discrepancies and divergences from the original proposal through the instigation of technical queries to projects/clients. 
  •  Verified and conceptualized the most optimum work route. Identify a clear scope of work/supply and accordingly plan/schedule the engineering activities and manpower resources. Identify and quantity the total number of engineering deliverables, man-hour allocation, the format of delivery, time schedules, and other requirements for execution of the work. 
  • Coordinated with projects and planning on project time schedules, establish target completion dates, and ensure target dates are achieved. 
  • Developed Manpower charts and schedules, recommend, assign and distribute manpower for the execution of engineering activities within budgeted project man-hours. Recommend cost-effective measures to reduce overall manpower costs. Assign personnel to the various activities; layout, material, stress, and 3D works. 
  •  Supervised the preparation of stress analysis reports in CAESAR II software and modeling works in PDS, ensuring that isometrics are updated as required. Monitor the identification of stress factors and layout feasibility, and resolve design irregularities. Provide stress and piping loads to the civil engineering group, and coordinate technical issues as required. 
  • Monitored the preparation of conceptual layouts and designs; obtain inputs from other engineering disciplines through the “want list” document, i.e., mechanical data sheets, foundation sizing, equipment layout, instrument specifications, and other necessary data. Guide the preparation of pipe wall thickness calculations and Reinforcement Pad (RP) calculations.
  • Directed and guided in the preparation and evaluation of plot plans, engineering drawings, and technical documents issued for Internal Design Checks (IDCs) and the integration of other engineering discipline data inputs. Prepare technical document requirements for equipment specifications. 
  • Directed the preparation of technical inquiry requests (Inquiry Requisitions) to vendors; participate in the technical evaluation of vendor bid offers. Direct and guide the Technical Bid Evaluations (TBE), and review vendor drawings and documents. Supervise the review of design calculations, and ensure vendor equipment specifications meet with client equipment specifications and are within budgeted costs. 
  • Directed and monitored Material Take off (MTO) activities identifies irregularities and shortfalls, take corrective action as required. 
  • Administered the preparation of Purchase Requisitions for the procurement of equipment and materials. Review vendor quality plans, and ensure vendor equipment’s compatibility and compliance with the scope of client specifications. Coordinate with procurement, and ascertain expedite of materials and equipment to the site. 
  • Monitored the issuance of engineering deliverables, and supervise the preparation of IFD’s “Issued for Design” and IFC’s, “Issued for Construction” documents encompassing the support standard document, plot plans, locations plan, piping plans, isometrics, material requirements, and other related plans and documents. 
  • Lead the development and issuance of engineering deliverables. i.e., isometrics to the site for construction, interface, and provide clarification and technical support to the construction and commissioning personnel. Administer the preparation of the final “As Built” and documents. 
  • Interfaced and regularly meet with client and vendor representatives, conduct internal staff meetings, and ensure the progress of the project by the schedule, allotted man hours, and budgeted costs. Coordinate with projects and planning departments on schedule-related issues. 

 

  • Participated in meetings with clients, vendors, and other discipline engineers to clarify and ensure vendor specifications cost-effectively meet client requirements. 
  • Participated in HAZOP meetings with clients and representatives of other engineering disciplines. 
  • Ensured compliance with Company’s ISO Quality procedures. Coordinate Internal and Client audit requests; facilitate audit procedures of engineering systems within the department. 
  • Interfaced and provided clarification and guidance and technical support to construction sites and commissioning engineers, providing startup assistance as required. 
  • Participated in employee performance evaluations, establish performance criteria, identify employee strengths and weaknesses, and recommend training and development requirements.
  • Provided support and assistance to direct supervisor on technical and non-technical issues. 
  • Accountable for managing and engineering multi-discipline projects from Front-End, Detail Design, Construction, Commissioning, Hand-Over, and Close-Out within schedule and cost.



 

 

  Projects Handled:

           US$ 240 million -Melut Basin Oil Development Project, Al Jabalyn Central                                    Processing Facility and Palogue Field Production Facility, SUDAN, Melut Basin Wastewater treatment plant, PIPELINE, AND PIER FACILITIES.

 

 

May 2004 to Sept 2004         PROJECT ENGINEER (MECHANICAL/PIPING)                                                   

                                                TECHNIP, Abu Dhabi UAE

 

 

Projects Handled:

US $ 300M Al-Dabiyah Central Processing Plant, ADCO-Shell, NEB (North East BAB Onshore Oil Field Dev Phase 1- UAE

Us $ 350M Rumaitah Central Processing Plant, ADCO- Shell, NEB (North East BAB Onshore Oil Field Dev Phase 1-UAE

 

 

April 2001 to April 2004         PRINCIPAL PIPING ENGINEER/ PROJECT ENGINEER                                           

                                                ABB Lummus Alireza co., ltd.

                                                 Al-Khobar, Kingdom of Saudi Arabia

              Projects Handled:

 

             Saudi Aramco Khuff Gas Condensate Project

             Saudi Aramco Marjan Offshore Platform

              Saudi Aramco Qatif Water Injection Offshore Platform

             Saudi Aramco Ras tanura Pier Extension Project.

              Yanbu Petrochemical Plant Debottlenecking Project, ABB LUMMUS HOUSTON-                       

             EXXON MOBIL Proj.

 

  • Supervise the pier extension construction for the Ras Tanura Project.
    1.                  SUMMARY OF WORK HISTORY BEFORE 1989

                                        

      October 1999 – April 2001      CONSTRUCTION MANAGER

                                JAPAN GAS CORPORATION, Philippines

                                Madrigal Business Park, Ayala, Alabang, 

                                 Muntinlupa, Metro Manila

                                 PHILIPPINES

Projects Handled: 

Ras Laffan Gas Expansion Project, Train 3 & Train 4, Doha, Qatar

Western Libya Gas Plant, (AGIP-SHELL) Libya

            Malaysia Liquefied Natural Gas, (MLNG II), Bintulu, Malaysia

 

         

1989-1999      ENGINEERING MANAGER /CONSTRUCTION MANAGER

                RYOSAN ENG’G CO. LTD HIROSHIMA, JAPAN

                                    (Affiliated with METALUM INTERNATIONAL)

 

PROJECTS HANDLED:

 

Singapore Phenol Plant, Mitsui Engineering, Sakra Island, Singapore

Thai Polyethylene Co., Mitsui Engineering, Rayong Thailand

Bangkok Polyethylene Plant, Mitsui Engineering, Bangkok Thailand

Venezuela Methanol Plant, Mitsubishi Heavy Industries, Venezuela

Bataan Combined Cycle Power Plant, Kawasaki Heavy, Philippines

Osaka LNG Plant, Osaka Japan, Mitsubishi,

Ar Razi Methanol Plant, Saudi Arabia, Mitsubishi

FPC USA CP-1 Thermal Power Plant (TAIWAN) Mitsubishi

FPCC UP-1 Thermal Power Plant (TAIWAN) Mitsubishi

Tohuko Electric Power-Haramachi Plant 1 CFPP

Tohuko Electric Power- Haramachi Plant 2- CFPP

RATCHABURI Thermal Power Plant UNIT 1T & 2T (THAILAND)

HIGASHI NIGATA 4 COMBINED CYCLE POWER PLANT (JAPAN)

KOASEKI YU OSAKA THERMAL POWER PLANT UNIT 2T (JAPAN)

HEBEI SANHE THERMAL POWER PLANT UNIT 1T & 2T (CHINA)

JANDAR COMBINED CYCLE POWER PLANT (SYRIA)

HI-5 COMBINED CYCLE POWER PLANT (JAPAN)

KANDEN OHSAKA 4U PLE (JAPAN)

KANSAI ELECTRIC CO. SAKAIKOH 4U PLE STEAM POWER PLANT (JAPAN)

Bataan Petrochemical Plant.

 

 

            

 

  1. 1987-1989 Atlantic Gulf and Pacific Company of Manila, Ltd. – CONSTRUCTION MANAGER

 

  • PROJECTS HANDLED;

Oil & Natural Gas Commission of India, BPB Process Offshore Platform, Bombay India

Red Dog Mine Quarters & Utility Deck, Offshore Platform R.M. Parsons Company, COMINCO, Alaska

LPG Facilities Expansion Project, BAHRAIN NATIONAL GAS.

 

  1.  1982-1987       MULMAC INDUSTRIAL CONSTRUCTION CORPORATION

                           PROJECT ENGINEER / FABRICATION MANAGER

 

  • PROJECTS HANDLED

Offshore Seawater Intake Facilities and wastewater treatment PASAR Copper Smelting Plant Pier Facilities Isabel Leyte

PHILIPPINE PHOSPHATE FERTILIZER plant, Isabel Leyte.

FORTUNE CEMENT CORPORATION-Coal Conversion Project, Mapulo, Taysan, Batangas

BACNOTAN CONSOLIDATED MINES INC., Belt Conveyor System, Subic, Zambales.

Far East Bank and Trust Company, Centralized HVAC systems

                                                        EDUCATION

 

 Bachelor of Science in Mechanical Engineering, MAPUA INSTITUTE OF TECHNOLOGY, Class 1981, Manila, Philippines

                     

                                    PROFESSIONAL AFFILIATIONS

 

                REGISTERED MECHANICAL ENGINEER (RME 022261) in the Philippines

                Philippine Society of Mechanical Engineers, Member

                Philippine Association of Mechanical and Electrical Engineers, Member

 

                                            PROFESSIONAL TRAINING

 

  1. Design and Installation of Centralized Air conditioning systems. Seminar sponsored by the Philippine Society of Mechanical Engineers held at Asian Institute of Management, Makati

       October 1984.

  1. 2001. COST ESTIMATING SEMINAR; Seminar on the different aspects of cost estimating conducted by Japan Gas Corporation, Philippines.
  2. 2001 PDS TRAINING; Training on the use of PDS piping, structure, and equipment modeling conducted by Japan Gas Corporation, Philippines.
  3. 2001. STRESS ANALYSIS TRAINING; Training on the use of stress analysis software AUTOPIPE sponsored by Japan Gas Corporation, Philippines.
  4. Smart Plant Review. ABB LUMMUS HOUSTON Project. Saudi Yanbu Petrochemical Co.,
  5. Offshore Sea Survival Training & Helicopter Underwater Escape Training.SRIBIMA                               Maritime Industries Sdn Bhd, Miri Sarawak Malaysia 
  6. MICROSOFT PROJECT TRAINING, Tan Duc IT School, Vietnam, October 2008.
  7. Workshop on Introduction to AS2885 and the Australian Pipeline Industry conducted by PIPEd Brisbane Australia on 27 July 2011 held at Cliftons CBD Brisbane.
  8. PDMS, PDS, Naviswork, Microsoft Office, Ceasar II, Smart Plant Software familiarity, PV ELITE. SHAPE 

 

 

 

SKILLS AND EXPERTISE

 

  • Project Management Consultant (PMC)
  • Technical Authority for Mechanical Piping
  • Design Management (Multi-discipline)
  • FEED Engineering
  • Conceptual Studies
  • Detail Engineering
  • Project Cost Estimation and Preparation of Bid documents, Manpower allocation, Equipment and tools schedule, and project schedules.
  • Contract Preparation and Contract Management 
  • Plant /Equipment /Piping Layout AND 3D Modeling for Equipment, Process Piping Utility Piping, and Cryogenic Piping.
  • Material Selection for vessels, equipment, pumps, and piping.
  • Marine Equipment and Piping Systems
  • Mechanical Handling.
  • Project Management, Project development
  • Management of Change
  • Piping Fabrication /Pressure Vessel Fabrication, Structural Fabrication, and Construction Supervision
  • Design and Installation of Equipment, Static, and Rotating Equipment
  • Design and Fabrication of Offshore Structures, and subsea installation.
  • Oil Storage Tank (API 650) Design and Construction.
  • Oil and Gas Process Equipment Skid Package Engineer
  • Oil and Gas Plant, WHP, and FPSO Mechanical Completion
  • Oil and Gas Plant, Power Plant, WHP, and FPSO Pre Commissioning / Commissioning /Plant Start-up and Maintenance.
  • Preservation/Maintenance of Equipment, Electrical, and Instruments.
  • Cleanroom management and set up, pollution abatement, water, and electrical systems. Pharmaceuticals and semiconductor plan,t.
  • Third-party Certification
  • Risk Based Inspection of Gas Plant, Piping and pipelines, wellhead, flow lines, and Static and Rotating Equipment.
  • Belt Conveyor, Screw conveyor, Bucket Elevator design construction, installation, commissioning, and maintenance.
  • HVAC, Plumbing, and Fire Protection Systems design, installation, and commissioning. (MEP).

 

 

Edukasyon

MAPUA INSTITUTE OF TECHNOLOGY, BACHELOR OF SCIENCE IN MECHANICAL ENGINEERING GRADUATE

Mga propesyonal mula sa parehong sektor ng Mga Utilities/Enerhiya tulad ng Ricardo Madridejos

Mga propesyonal mula sa iba't ibang sektor malapit sa Biñan, Laguna

Iba pang mga gumagamit na tinatawag na Ricardo

Trabaho malapit sa Biñan, Laguna

  • Neksjob Philippines

    Financial Services Senior Manager

    Natagpuan sa: Foundit PH A2 - 2 araw ang nakalipas


    Neksjob Philippines Taguig, Pilipinas

    Financial Services Senior Manager (Capital Markets) · Salary Range: PHP160,000 - PHP200,000/month · Taguig · ​You will work with our global teams to help investment banks, asset and wealth managers, and exchanges, prepare for the digital future. · Together, let's leverage global ...

  • Ascentpro OPC

    Fresh Graduate for Call Center Agent

    Natagpuan sa: Foundit PH A2 - 2 araw ang nakalipas


    Ascentpro OPC Taguig City, Pilipinas

    Open for new Fresh graduates (2023 to present) · Without or with work experience · Willing to work onsite (Taguig City) · Take customer calls and provide accurate, satisfactory answers to their queries and concerns · De-escalate situations involving dissatisfied customers, offeri ...

  • John Clements Recruitment Inc.

    Information Technology Jr. Specialist

    Natagpuan sa: Talent PH A C2 - 1 linggo ang nakalipas


    John Clements Recruitment Inc. Tanauan, Pilipinas Permanent

    Candidate must possess at least Bachelor's degree in Information Technology / Computer Science/ Computer EngineeringWith a minimum of 10 years of work related experience in administering server-side technology and networked computing systems.In-depth understanding and practical k ...