beBee background
Propesyonal
>
Cebu City
Robert Degollacion

Robert Degollacion

Piping Supervisor / Piping Foreman

Konstruksiyon/Pasilidad

Cebu City, Cebu

Panlipunan


Tungkol sa Robert Degollacion:

I am writing to express my interest in the Piping supervisor or Piping Foreman Position that was advertised. I believe my education and previous work experience in the Piping Supervisor / Piping Foreman / Pipe Fitter well with the qualifications that required to the position.

 

Having worked within the industry for all over of 21 years with a GCC experience of more than 15 years, I have developed a wide range of skills that would meet, and exceed the expectations for the role. I possess a good understanding and excellent knowledge, of using different kinds of Machines and Tools and Equipment experience.  

 

In my present role as an Piping Foreman for ABCD Company ( Saudi bin laden Groups of Company ) I have many achievements, including the hard core experience in the Petrochemicals Areas of Taiwan, United Arab of Emirates. and OIL & Gas Areas of Malaysia and Saudi Arabia. and Power & DesalinationPlant Areas. of Philippine and United Arab of Emirates Abu Dhabi. and Airport Areas mainly on Jeddah Saudi Arabia.

 

My experience is an excellent  fit for the list of requirements in this job.  and good opportunity to share my technical skills in the fabrication & site installation. 

  • I am open minded, well organized and dedicated to work.
  • I am conscientious, responsible and with strong technical skills.
  • To ensure quality of work and confirm to work procedures.
  • Can read and interpret piping system fire protection, architectural, and structural plants and specifications.
  • To ensure proper fit-up and orientation of system and mechanical equipment to prevent recurrence of work.
  • Preparation/Review of Piping specifications, pipe classes, pipe wall thickness including external pressure & branch chart calculations.
  • To ensure of quality of works and safety and deliver project on time
  • Construct various types of pipe joints for use in sprinkler system including threading and grooved.
  • Read and interpret plans, blueprints, Isometric, P & ID, sketches and specifications
  • Most work safety and efficiency. 

Karanasan

 SUMMARY:

Construction Piping Foreman adept at finding engaging ways to motivate construction teams to exceed expectation and maintain high standards. Over 21 years of comprehensive piping experience in Oil & Gas, Power & Desalination Plant, Petrochemical Fields.                                                                                                                       

SKILLS:     

Construction Skills, Communication Skills, Technical Skills, Management Skills.                                     

WORK EXPERIENCES:

Position: Piping Foreman

June 2020  up  to Present

 

Company Name:    ABCD Saudi Bin laden Groups of Company

Project Name & Address:   King Abdul-Aziz International Airport project 

                                            Jeddah, Saudi Arabia 

DUTIES & RESPONSIBILITIES:

  • Supervise & layout of chilled water line, water line, pumps, fire protection installtion and fabrication.
  • To produce quality workmanship in accordance with specification as per plan.
  • Responsible in the erection & installation of 6”Ø to 10”Ø carbon steel pipe of the Chilled water pipe at the pump area.
  • Responsible in the erection & installation  2”Ø to 6”Ø of chilled water pipe at the AHU area.
  • Responsible in the erection & installation of 1”Ø to 8”Ø carbon steel pipe of fire fighting pipe.
  • Responsible in the installation of supports, clamps, brackets and hangers, and rigid supports
  • Responsible to implement the safety rules and regulation

 

Position:   Piping Foreman

August 2017  -  May 2020

 

Company Name:    Advance Vision Saudi Bin laden Groups of Company

Project Name & Address:   King Abdul-Aziz International Airport project

                                            Jeddah, Saudi Arabia 

DUTIES & RESPONSIBILITIES:

  • To produce quality workmanship in accordance with specification as per plan.
  • Can read and interpret fire protection, architectural, and structural plants and specifications.
  • Prepared and assembled for installation by cutting, threading. and grooved the pipe.
  • Responsible for the erection & installation main chilled water pipe 8”Ø to 12”Ø to 20”Ø carbon steel pipe at the Main header room area.
  • Responsible in the erection & installation of 4”Ø to 10”Ø carbon steel pipe of the fire fighting pipe. 
  • Responsible for the installation of the clamps, brackets and hangers support and rigid support. 
  • Responsible to implement the safety rules and regulations.

 

Position:  Piping Foreman

October 2014  -  October 2015

 

Company Name:    Hyundai Engineering & Constructing   

Project Name & Address:   Borouge-3 Utilities & Offsite Project 

                                            Al- Ruwais  Abu Dhabi, United Arab Emirates  

DUTIES & RESPONSIBILITIES:

  • Interpret & understanding stiches given by Supervisor indeed for fabrication or erection.
  • To produce quality workmanship in accordance with specification as per plan.
  • Responsible in the erection & installation of 6”Ø to 12”Ø  stainless steel pipe at the pipe rack area.
  • Responsible in the erection & installation of 10”Ø to 18”Ø chrome alloy steel pipe at the flare area.
  • Responsible in the erection & installation of 4”Ø to 12”Ø carbon steel pipe at the pipe rack area.
  • Fabrication & installing of small bore 1/2”Ø to 2”Ø pipe. 
  • Hoisted loads using slings, chains, shackles, hocks, cables, and other rigging equipment.
  • Responsible to implement the safety rules and regulation.

 

Position:   Piping Supervisor 

October 2011  -  September 2014

 

Company Name:   KOAM Electromechanical L.L.C

Project Name & Address:   Borouge-3 Utilities & Offsite Project 

                                            Al- Ruwais  Abu Dhabi, United Arab Emirates

DUTIES & RESPONSIBILITIES:

  • Supervise & layout of chilled water line, pumps, fire protection installtion and fabrication.
  • To produce quality workmanship in accordance with specification as per plan.
  • Measure, cut, thread and grooved pipes to required shape and size.
  • Responsible in the erection & installation  6”Ø to 10”Ø carbon steel pipe at the Chillier area.
  • Responsible in the erection & installation 4”Ø to 8”Ø carbon steel of Chilled water pipe at the AHU area,
  • Responsible in the erection & installation  1”Ø to 6”Ø of fire fighting pipe.
  • Responsible in the hydro test & flushing of fire fighting piping and chilled water piping.
  • Responsible in the installation of the valves, supports, hangers, clamps, brackets and rigid supports.
  • Responsible to implement the safety rules and regulation.

               

Position:   Piping Supervisor 

May 2008  -  August 2011

 

Company Name:    ZENER Kiddie Fire & Security L.L.C

Project Name & Address:   Dubai Electric Water & Authority Desalination Power Project

                                            ( Station “M“) Jebel Ali Dubai, United Arab emirates 

DUTIES & RESPONSIBILITIES:

  • To produce quality workmanship in accordance with specification as per DEWA requirement.
  • Can read and interpret fire protection, architectural, and structural plants and specifications.
  • Supervise & layouts of fire pumps, fire protection pipe and fabrication.
  • Responsible on manpower assignment together with its proper resignation.
  • Responsible in the erection & installation  2”Ø to 10”Ø of fire fighting pipe at the DFO tank area.
  •  Responsible in the erection & installation  1”Ø to 6”Ø of fire fighting pipe at the CCB & Tunnel area.

 

  • Responsible for the pneumatic test & flushing of Co2 & FM200 fire suppression system.
  • Responsible in the hydro test & flushing of fire fighting pipe
  • Responsible in the installation of supports, hangers, clamps, brackets, and rigid supports.
  • Responsible to implement the safety rules and regulation. 

 

Piping:   Piping Foreman 

January 2007  - March 2008 

 

Company Name:   SAMHO Korem Tech. L.L.C

Project Name & Address:   Dubai Electric Water & Authority Desalination Power Project

                                            ( Station “ L2 “) Jebel Ali Dubai, United Arab emirates 

DUTIES & RESPONSIBILITIES:

  • To produce quality workmanship in accordance with specification as per plan.
  • Can read and interpret fire protection, architectural, and structural plants and specifications.
  • Responsible in the erection & installation of 10”Ø carbon steel pipe of the Chilled water pipe line at the pipe rack area.
  • Responsible in the erection & installation  4”Ø to 8”Ø of chilled water pipe at the Chiller & AHU area.
  • Responsible in the erection & installation of 1”Ø to 6”Ø carbon steel pipe of fire fighting pipe.
  • Responsible in the installation of supports, clamps, brackets and hangers, and rigid supports
  • Responsible to implement the safety rules and regulation.

 

Position:   Pipe Fitter 

February 2005  -  January 2007

 

Company Name:   HCCT Contractor Company / SHIN Nippon Tech. L.L.C

Project Name & Address:   Dubai Electric Water & Authority Desalination Power Project 

                                            ( Station “ L1 “) Jebel Ali Dubai, United Arab emirates 

DUTIES & RESPONSIBILITIES:

  • To produce quality workmanship in accordance with specification as per plan.
  • Erection & installation 6”Ø to 10”Ø carbon steel pipe of chilled water piping at the chiller area.
  • Erection & installation 4”Ø to 6”Ø carbon steel pipe at the AHU units.
  • Measure, cut, thread and pipes to required shape and size.
  • Pneumatic test & flushing of refrigerant pipe.
  • Hydro test & flushing of chilled water pipe.
  • Fabrication & installation of supports, hangers, clamps, brackets, and rigid supports.
  • Most work safety and efficiency.

 

Piping:   Piping Foreman 

September 2004 t - January 2005

 

Company Name:   D+G Contractor Company

Project Name & Address:   Air Liquid Philippine, Oil & Gas project

                                            Baunoy, Balamban Cebu, Philippines

DUTIES & RESPONSIBILITIES:

  • To produce quality workmanship in accordance with specification as per plan.
  • Identify of materials and be able locate it’s size.
  • Double checked all coordinates and elevations.
  • Responsible for the erection & installation of 4” Ø to 24”Ø pipe at the pen fan cooling tower area.
  • Responsible for the fabrication & installation of all small bore pipe.
  • Responsible for the erection & installation of 6” Ø to 10”Ø gas line at the pipe rack area.
  • Install of the dummy leg supports, and rigid supports.
  • Most work safety and efficiency.

 

Position:   Pipe Fitter

February 2003  -  August2004

 

Company Name:   Consolidated Contractors Company W.L.L / SNAMPROJITTE Engineering

Project Name & Address:   Qatif Gosp-1 Refinery Oil and Gas Project

                                            Rahema Rastanura, Saudi Arabia

DUTIES & RESPONSIBILITIES:

  • Interpret & understanding stitches given by Foreman and indeed for fabrication and erection.
  • To produce quality workmanship in accordance with specification as per plan.
  • Identify of materials and be able to locate it’s size.
  • Erection & installation of 56”Ø carbon steel pipe at the pipe main rack area.
  • Erection & installation of 24”Ø alloy steel pipe at the pipe rack area.
  • Erection & installation of 32”Ø heavy wall steel pipe at the pipe rack area.
  • Install of the dummy leg supports, and rigid supports.
  • Most work safety and efficiency.

 

Position:   Pipe Fitter

October 2001  -  November 2002

   

Company Name:   DOTANAH Engineering & Constructing SDN. BHD 

                               JGC / KELLOGG (Slime Consortium) 

Project Name & Address:   MLNG Refinery Oil and Gas Project

                                            Bintulo, Malaysia                                                                         

DUTIES & RESPONSIBILITIES:

  • To produce quality workmanship in accordance with specification as per plan.
  • Erection & installation of 10”Ø to 36”Ø seamless carbon steel pipe at the pen fan cooling tower area.
  • Erection & installation of 8”Ø to 20”Ø  stainless steel pipe at compressor area.
  • Hoisted loads using slings, chains, shackles, hocks, cables, and other rigging equipment.
  • Fabrication & installing of small bore 1/2”Ø to 2”Ø pipe. 
  • Installing of the variable spring hanger supports dummy leg supports
  • Most work safety and efficiency.

 

Position:   Pipe Fitter

February 1999  -  December 1999 

   

Company Name:   DAELIM Industrial Co. LTD

Project Name & Address:   Formosa plastic Corporation / Petroleum company

                                            Mailiao Taiwan , R.O.C

DUTIES & RESPONSIBILITIES:

  • Interpret & understanding stiches given by Foreman or Supervisor indeed for fabrication or erection.
  • Identify of materials and be able to locate it’s size.
  • Erection & installation of 24”Ø & 30”Ø heavy wall steel pipe at the pipe rack area. And going to the guard reactor and feed furnace.
  • Erection & installation of 8”Ø to 24”Ø alloy steel pipe at pipe rack area
  • Erection & installation of 10”Ø to 18”Ø stainless steel pipe at pipe rack area.
  • Most work safety and efficiency.

Position: Piping Foreman

October 1997  -  February 1998

                                                                                                                                   

Company Name:   EEI Corporation Inc. Philippines

Project Name & Address:   J.J Summit plastic corporation / Petrochem project.

                                            Simlong Batangas , Philippines 

DUTIES & RESPONSIBILITIES:

  • Interpret & understanding stiches given by Supervisor indeed for fabrication or erection.
  • To produce quality workmanship in accordance with specification as per plan. 
  • Responsible in the erection & installation of 10”Ø to 24”Ø chrome alloy steel pipe at the flare area.
  • Responsible in the erection & installation of 18”Ø seamless carbon steel pipe at the pipe rack area.
  • Responsible in the erection & installation of 8”Ø to 24”Ø pipe at the compressor area.
  • Most work safety and efficiency.

 

Position:   Piping Foreman

May 1996  -  September 1997

 

Company Name:   ALC Company / Kiewit Holt Philippines 

Project Name & Address:   180 Mega Watts ( 1X3 ) Luzon Geothermal power plant project.

                                            PNOC – Mahanagdong Ormoc Leyte, Philippines 

DUTIES & RESPONSIBILITIES:

  • Interpret & understanding stiches given by supervisor indeed for fabrication or erection. 
  • Prepared welded, fabricated, installed and fit. Pipe to specifications needed to complete the works.
  • Identify of materials and be able to locate it’s size.
  • Calculating the cut off for fittings.
  • Responsible in the installation of 3”Ø to 8”Ø stainless pipe in the lube oil line turbine generator.
  • Responsible for the erection & installation of 24”Ø 30”Ø main steam pipe line, at the steam turbine generator.
  • Responsible in the erection & installation of 6”Ø to 18”Ø stainless pipe at the vacuum pump to condenser area.
  • Responsible in the installation of variable spring hanger supports, dummy leg supports.
  • Most work safety and efficiency.

 

Position:   Piping Foreman

December 1995  -  May 1996

 

Company Name:   ALLTECH Contractor Company /  Marubeni TDK / Fuji Electric  Philippines 

Project Name & Address:   232.5 Mega watts (1X3) Visayas Geothermal power plant project

                                            PNOC - Malitbog Ormoc Leyte, Philippines 

DUTIES & RESPONSIBILITIES:

  • Interpret & understanding stiches given by supervisor indeed for fabrication or erection.
  • Identify of materials and be able to locate it’s size.
  • Double checked all coordinates and elevations.
  • Responsible for the erection & installation of 20”Ø to 24”Ø main steam pipe, at the steam purifier to the steam turbine generator.
  • Responsible in the erection & installation of 4” Ø to 12”Ø stainless pipe at the cooling tower area.
  • Responsible in the fabrication & installation of the small bore 1”Ø to 2”Ø pipe.
  • Most work safety and efficiency.

 

Edukasyon

College:        Course: Electronics                                  Date Graduated: 1990 Under Graduate

 

                        School: BIT International College             Address:             Tagbilaran City Bohol,             

                                                                                                                    Philippines

High School: Naga National High School                      Date Graduated: 1988

                                                                                        Address:              West Poblacion City of 

                                                                                                                    Naga Cebu, Philippines

Elementary:  Cepoc elementary school                         Date Graduated: 1983

                                                                                         Address:             Tina-an city of Naga   

                                                                                                                      Cebu, Philippines

Mga propesyonal mula sa parehong sektor ng Konstruksiyon/Pasilidad tulad ng Robert Degollacion

Mga propesyonal mula sa iba't ibang sektor malapit sa Cebu City, Cebu

Iba pang mga gumagamit na tinatawag na Robert

;