Tungkol sa Robert Degollacion:
I am writing to express my interest in the Piping supervisor or Piping Foreman Position that was advertised. I believe my education and previous work experience in the Piping Supervisor / Piping Foreman / Pipe Fitter well with the qualifications that required to the position.
Having worked within the industry for all over of 21 years with a GCC experience of more than 15 years, I have developed a wide range of skills that would meet, and exceed the expectations for the role. I possess a good understanding and excellent knowledge, of using different kinds of Machines and Tools and Equipment experience.
In my present role as an Piping Foreman for ABCD Company ( Saudi bin laden Groups of Company ) I have many achievements, including the hard core experience in the Petrochemicals Areas of Taiwan, United Arab of Emirates. and OIL & Gas Areas of Malaysia and Saudi Arabia. and Power & DesalinationPlant Areas. of Philippine and United Arab of Emirates Abu Dhabi. and Airport Areas mainly on Jeddah Saudi Arabia.
My experience is an excellent fit for the list of requirements in this job. and good opportunity to share my technical skills in the fabrication & site installation.
- I am open minded, well organized and dedicated to work.
- I am conscientious, responsible and with strong technical skills.
- To ensure quality of work and confirm to work procedures.
- Can read and interpret piping system fire protection, architectural, and structural plants and specifications.
- To ensure proper fit-up and orientation of system and mechanical equipment to prevent recurrence of work.
- Preparation/Review of Piping specifications, pipe classes, pipe wall thickness including external pressure & branch chart calculations.
- To ensure of quality of works and safety and deliver project on time
- Construct various types of pipe joints for use in sprinkler system including threading and grooved.
- Read and interpret plans, blueprints, Isometric, P & ID, sketches and specifications
- Most work safety and efficiency.
Karanasan
SUMMARY:
Construction Piping Foreman adept at finding engaging ways to motivate construction teams to exceed expectation and maintain high standards. Over 21 years of comprehensive piping experience in Oil & Gas, Power & Desalination Plant, Petrochemical Fields.
SKILLS:
Construction Skills, Communication Skills, Technical Skills, Management Skills.
WORK EXPERIENCES:
Position: Piping Foreman
June 2020 up to Present
Company Name: ABCD Saudi Bin laden Groups of Company
Project Name & Address: King Abdul-Aziz International Airport project
Jeddah, Saudi Arabia
DUTIES & RESPONSIBILITIES:
- Supervise & layout of chilled water line, water line, pumps, fire protection installtion and fabrication.
- To produce quality workmanship in accordance with specification as per plan.
- Responsible in the erection & installation of 6ӯ to 10ӯ carbon steel pipe of the Chilled water pipe at the pump area.
- Responsible in the erection & installation 2ӯ to 6ӯ of chilled water pipe at the AHU area.
- Responsible in the erection & installation of 1ӯ to 8ӯ carbon steel pipe of fire fighting pipe.
- Responsible in the installation of supports, clamps, brackets and hangers, and rigid supports
- Responsible to implement the safety rules and regulation
Position: Piping Foreman
August 2017 - May 2020
Company Name: Advance Vision Saudi Bin laden Groups of Company
Project Name & Address: King Abdul-Aziz International Airport project
Jeddah, Saudi Arabia
DUTIES & RESPONSIBILITIES:
- To produce quality workmanship in accordance with specification as per plan.
- Can read and interpret fire protection, architectural, and structural plants and specifications.
- Prepared and assembled for installation by cutting, threading. and grooved the pipe.
- Responsible for the erection & installation main chilled water pipe 8ӯ to 12ӯ to 20ӯ carbon steel pipe at the Main header room area.
- Responsible in the erection & installation of 4ӯ to 10ӯ carbon steel pipe of the fire fighting pipe.
- Responsible for the installation of the clamps, brackets and hangers support and rigid support.
- Responsible to implement the safety rules and regulations.
Position: Piping Foreman
October 2014 - October 2015
Company Name: Hyundai Engineering & Constructing
Project Name & Address: Borouge-3 Utilities & Offsite Project
Al- Ruwais Abu Dhabi, United Arab Emirates
DUTIES & RESPONSIBILITIES:
- Interpret & understanding stiches given by Supervisor indeed for fabrication or erection.
- To produce quality workmanship in accordance with specification as per plan.
- Responsible in the erection & installation of 6ӯ to 12ӯ stainless steel pipe at the pipe rack area.
- Responsible in the erection & installation of 10ӯ to 18ӯ chrome alloy steel pipe at the flare area.
- Responsible in the erection & installation of 4ӯ to 12ӯ carbon steel pipe at the pipe rack area.
- Fabrication & installing of small bore 1/2ӯ to 2ӯ pipe.
- Hoisted loads using slings, chains, shackles, hocks, cables, and other rigging equipment.
- Responsible to implement the safety rules and regulation.
Position: Piping Supervisor
October 2011 - September 2014
Company Name: KOAM Electromechanical L.L.C
Project Name & Address: Borouge-3 Utilities & Offsite Project
Al- Ruwais Abu Dhabi, United Arab Emirates
DUTIES & RESPONSIBILITIES:
- Supervise & layout of chilled water line, pumps, fire protection installtion and fabrication.
- To produce quality workmanship in accordance with specification as per plan.
- Measure, cut, thread and grooved pipes to required shape and size.
- Responsible in the erection & installation 6ӯ to 10ӯ carbon steel pipe at the Chillier area.
- Responsible in the erection & installation 4ӯ to 8ӯ carbon steel of Chilled water pipe at the AHU area,
- Responsible in the erection & installation 1ӯ to 6ӯ of fire fighting pipe.
- Responsible in the hydro test & flushing of fire fighting piping and chilled water piping.
- Responsible in the installation of the valves, supports, hangers, clamps, brackets and rigid supports.
- Responsible to implement the safety rules and regulation.
Position: Piping Supervisor
May 2008 - August 2011
Company Name: ZENER Kiddie Fire & Security L.L.C
Project Name & Address: Dubai Electric Water & Authority Desalination Power Project
( Station “M“) Jebel Ali Dubai, United Arab emirates
DUTIES & RESPONSIBILITIES:
- To produce quality workmanship in accordance with specification as per DEWA requirement.
- Can read and interpret fire protection, architectural, and structural plants and specifications.
- Supervise & layouts of fire pumps, fire protection pipe and fabrication.
- Responsible on manpower assignment together with its proper resignation.
- Responsible in the erection & installation 2ӯ to 10ӯ of fire fighting pipe at the DFO tank area.
- Responsible in the erection & installation 1ӯ to 6ӯ of fire fighting pipe at the CCB & Tunnel area.
- Responsible for the pneumatic test & flushing of Co2 & FM200 fire suppression system.
- Responsible in the hydro test & flushing of fire fighting pipe
- Responsible in the installation of supports, hangers, clamps, brackets, and rigid supports.
- Responsible to implement the safety rules and regulation.
Piping: Piping Foreman
January 2007 - March 2008
Company Name: SAMHO Korem Tech. L.L.C
Project Name & Address: Dubai Electric Water & Authority Desalination Power Project
( Station “ L2 “) Jebel Ali Dubai, United Arab emirates
DUTIES & RESPONSIBILITIES:
- To produce quality workmanship in accordance with specification as per plan.
- Can read and interpret fire protection, architectural, and structural plants and specifications.
- Responsible in the erection & installation of 10ӯ carbon steel pipe of the Chilled water pipe line at the pipe rack area.
- Responsible in the erection & installation 4ӯ to 8ӯ of chilled water pipe at the Chiller & AHU area.
- Responsible in the erection & installation of 1ӯ to 6ӯ carbon steel pipe of fire fighting pipe.
- Responsible in the installation of supports, clamps, brackets and hangers, and rigid supports
- Responsible to implement the safety rules and regulation.
Position: Pipe Fitter
February 2005 - January 2007
Company Name: HCCT Contractor Company / SHIN Nippon Tech. L.L.C
Project Name & Address: Dubai Electric Water & Authority Desalination Power Project
( Station “ L1 “) Jebel Ali Dubai, United Arab emirates
DUTIES & RESPONSIBILITIES:
- To produce quality workmanship in accordance with specification as per plan.
- Erection & installation 6ӯ to 10ӯ carbon steel pipe of chilled water piping at the chiller area.
- Erection & installation 4ӯ to 6ӯ carbon steel pipe at the AHU units.
- Measure, cut, thread and pipes to required shape and size.
- Pneumatic test & flushing of refrigerant pipe.
- Hydro test & flushing of chilled water pipe.
- Fabrication & installation of supports, hangers, clamps, brackets, and rigid supports.
- Most work safety and efficiency.
Piping: Piping Foreman
September 2004 t - January 2005
Company Name: D+G Contractor Company
Project Name & Address: Air Liquid Philippine, Oil & Gas project
Baunoy, Balamban Cebu, Philippines
DUTIES & RESPONSIBILITIES:
- To produce quality workmanship in accordance with specification as per plan.
- Identify of materials and be able locate it’s size.
- Double checked all coordinates and elevations.
- Responsible for the erection & installation of 4” Ø to 24”Ø pipe at the pen fan cooling tower area.
- Responsible for the fabrication & installation of all small bore pipe.
- Responsible for the erection & installation of 6” Ø to 10”Ø gas line at the pipe rack area.
- Install of the dummy leg supports, and rigid supports.
- Most work safety and efficiency.
Position: Pipe Fitter
February 2003 - August2004
Company Name: Consolidated Contractors Company W.L.L / SNAMPROJITTE Engineering
Project Name & Address: Qatif Gosp-1 Refinery Oil and Gas Project
Rahema Rastanura, Saudi Arabia
DUTIES & RESPONSIBILITIES:
- Interpret & understanding stitches given by Foreman and indeed for fabrication and erection.
- To produce quality workmanship in accordance with specification as per plan.
- Identify of materials and be able to locate it’s size.
- Erection & installation of 56ӯ carbon steel pipe at the pipe main rack area.
- Erection & installation of 24ӯ alloy steel pipe at the pipe rack area.
- Erection & installation of 32ӯ heavy wall steel pipe at the pipe rack area.
- Install of the dummy leg supports, and rigid supports.
- Most work safety and efficiency.
Position: Pipe Fitter
October 2001 - November 2002
Company Name: DOTANAH Engineering & Constructing SDN. BHD
JGC / KELLOGG (Slime Consortium)
Project Name & Address: MLNG Refinery Oil and Gas Project
Bintulo, Malaysia
DUTIES & RESPONSIBILITIES:
- To produce quality workmanship in accordance with specification as per plan.
- Erection & installation of 10ӯ to 36ӯ seamless carbon steel pipe at the pen fan cooling tower area.
- Erection & installation of 8ӯ to 20ӯ stainless steel pipe at compressor area.
- Hoisted loads using slings, chains, shackles, hocks, cables, and other rigging equipment.
- Fabrication & installing of small bore 1/2ӯ to 2ӯ pipe.
- Installing of the variable spring hanger supports dummy leg supports.
- Most work safety and efficiency.
Position: Pipe Fitter
February 1999 - December 1999
Company Name: DAELIM Industrial Co. LTD
Project Name & Address: Formosa plastic Corporation / Petroleum company
Mailiao Taiwan , R.O.C
DUTIES & RESPONSIBILITIES:
- Interpret & understanding stiches given by Foreman or Supervisor indeed for fabrication or erection.
- Identify of materials and be able to locate it’s size.
- Erection & installation of 24ӯ & 30ӯ heavy wall steel pipe at the pipe rack area. And going to the guard reactor and feed furnace.
- Erection & installation of 8ӯ to 24ӯ alloy steel pipe at pipe rack area
- Erection & installation of 10ӯ to 18ӯ stainless steel pipe at pipe rack area.
- Most work safety and efficiency.
Position: Piping Foreman
October 1997 - February 1998
Company Name: EEI Corporation Inc. Philippines
Project Name & Address: J.J Summit plastic corporation / Petrochem project.
Simlong Batangas , Philippines
DUTIES & RESPONSIBILITIES:
- Interpret & understanding stiches given by Supervisor indeed for fabrication or erection.
- To produce quality workmanship in accordance with specification as per plan.
- Responsible in the erection & installation of 10ӯ to 24ӯ chrome alloy steel pipe at the flare area.
- Responsible in the erection & installation of 18ӯ seamless carbon steel pipe at the pipe rack area.
- Responsible in the erection & installation of 8ӯ to 24ӯ pipe at the compressor area.
- Most work safety and efficiency.
Position: Piping Foreman
May 1996 - September 1997
Company Name: ALC Company / Kiewit Holt Philippines
Project Name & Address: 180 Mega Watts ( 1X3 ) Luzon Geothermal power plant project.
PNOC – Mahanagdong Ormoc Leyte, Philippines
DUTIES & RESPONSIBILITIES:
- Interpret & understanding stiches given by supervisor indeed for fabrication or erection.
- Prepared welded, fabricated, installed and fit. Pipe to specifications needed to complete the works.
- Identify of materials and be able to locate it’s size.
- Calculating the cut off for fittings.
- Responsible in the installation of 3ӯ to 8ӯ stainless pipe in the lube oil line turbine generator.
- Responsible for the erection & installation of 24ӯ 30ӯ main steam pipe line, at the steam turbine generator.
- Responsible in the erection & installation of 6ӯ to 18ӯ stainless pipe at the vacuum pump to condenser area.
- Responsible in the installation of variable spring hanger supports, dummy leg supports.
- Most work safety and efficiency.
Position: Piping Foreman
December 1995 - May 1996
Company Name: ALLTECH Contractor Company / Marubeni TDK / Fuji Electric Philippines
Project Name & Address: 232.5 Mega watts (1X3) Visayas Geothermal power plant project
PNOC - Malitbog Ormoc Leyte, Philippines
DUTIES & RESPONSIBILITIES:
- Interpret & understanding stiches given by supervisor indeed for fabrication or erection.
- Identify of materials and be able to locate it’s size.
- Double checked all coordinates and elevations.
- Responsible for the erection & installation of 20ӯ to 24ӯ main steam pipe, at the steam purifier to the steam turbine generator.
- Responsible in the erection & installation of 4” Ø to 12”Ø stainless pipe at the cooling tower area.
- Responsible in the fabrication & installation of the small bore 1ӯ to 2ӯ pipe.
- Most work safety and efficiency.
Edukasyon
College: Course: Electronics Date Graduated: 1990 Under Graduate
School: BIT International College Address: Tagbilaran City Bohol,
Philippines
High School: Naga National High School Date Graduated: 1988
Address: West Poblacion City of
Naga Cebu, Philippines
Elementary: Cepoc elementary school Date Graduated: 1983
Address: Tina-an city of Naga
Cebu, Philippines