Profile
>
Mga Post ni Siegfred
Siegfred Perez

Siegfred Perez

Transmission Lineman Erector / Assembler

Tarlac City, Tarlac

Siegfred Perez

2 buwan ang nakalipas

Transmission lineman Erector / assembler

~ F. Perez

 

WORK EXPERIENCE

MTP Enterprises

(Formerly MTP Construction)

Transmission Line/Communication Contractor 412 Anonas St Brgy. Maligaya, Tarlac City, Philippines

Cell No: 09507814874 /Email: mtp construction@yahoo.com.ph
Position : Assembler/Erector

Date © August 14, 2019" Present (On Call )

Mepcon Philippines Incorporated

No. 4 Lily Hill Plaza, C.M. Recto Hi-way, Clark Freeport Zone, Pampanga
Telephone: 045-499-2228

Po:

  

on: OcvgtiedE gps got

Date : Fgego dgt'3: "4238 F gego dgt 53.3239

MTP Construction

Transmission Line/Communication Contractor 412 Anonas St Maligaya,
San Miguel, Tarlac City Cell No 09159094721
Email mtp_construction@yahoo com ph

  

Po:

 

on Lineman/Assembler/Erector
Date : January 3, 2007 to February 4, 2012

Job Description

® Hauling and segregation of tower parts according to part number and sizes.

® Setting up of a ginpole followed by tying of rope in shackle to the lower and upper part

of ginpole.

Engine puller settings (improvised)

® Attaching of pulleys on the top of ginpole followed by pulling rope connected to the
pulleys going to engine puller used to lifting tower parts.

  

Perform tower assembly by using blue print of tower.
® Perform tower erection 69KV, 230KV, S00KV portion by portion from primary
legs, waist

body.cage,bottom cross arm, middle cross arm, upper cross arm, etc

Assisting in lifting of ginpole using square rigging method.

® Climbing safely with complete PPE with a pack of bolts and nuts, lock washer, spud
wrench, sling, wrench.exira carabiner.

Bolts tightening and correction.

 

IE

.D. CALDERON

     
   

Energy

 
  

MTPE
Phone: 0950
Email. mip comstruction@yahoo com ph Phone 0416846823

 

814874 North East Terrace M

Siegfred

Assembler/Erector/Lineman

72630/+639568734492

nonas St
Maligaya, Tarlac City, Tarlac,
HIN

PT

Capas National High School
Ter)
CR = SE

Saint Paul College of Tarlac
2 Year - Associate in Computer Science

(Graduate)
-

Steel Works
NERDY
Masonry
LETT
Bulldozer Ope

ROA) 28 § ei

IZ nal Height Safety Traimng and Fall
Arrest Equipment

Safe working at besghts

Mast and tower climbing

Tower rescu

Inspection and M.

CERT NO

CREAN

EXPIRY DATE

< TESDA (Technical Fducation and
RITTER BE TO)
(OVA 7014 EN R(OhR RT:

SSUE DATE - 1
PIRY DATE -|

0 like · 0 komento

Portfolio & Serbisyo

Gusto mo bang pamahalaan ang iyong sariling grupo?

orange logo